4 Lanes?
Getting it partially ready to go to 4 lanes when I get another 200+ pieces of track.
I was going to jump right into 4 lanes but decided I just do this end like this for now and keep it 2 lanes.
I need to order some "Track Clips" to keep the tracks even side by side.

I've taken the Banked turns off both ends of the layout


This turn has 6 R3 pieces with a R2 between them so it would fit on the benchwork. When I go to 4 lanes I can change it to all R3s because the main straightaway's location won't be detemined by the 8x8 upright that's 1/2 way down the layout.


Back
Home
Page 62